Ephesus Venetian & Palace
Step 1: Let dry for 8-12 hours.
Step 2: After at least 4 hours, apply one or more coats of stucco Venetian or stucco Palace with stainless steel trowel extending in one direction and equating with care.
Step 3: Once the uniform lying and dry (12 hours) sand grain (240-320) with emphasis on removal of imperfections and remove dust.
Step 4: With the same stucco begin to silk alternately, with flat or stainless steel spatula with irregular strokes, 1m2 approximately tranches spatula until complete riding the surface, creating colour effects such marbling.
Step 5: Before the complete drying (30-60 minutes), obtain the natural shine with a stainless trowel or spatula., Very clean, slightly bowed, lobbying and acting in all directions.
Step 6: You can increase and protect the stucco and Venetian Palace, with our wax to plaster, extending well with spatula or sponge and then wiping with a cotton cloth or mechanical polishing.
|








